PA9

9 Patron str, Thessaloniki

IN PROGRESS
  • TOTAL AREA

    2.039 sqm

  • YEAR OF COMPLETION

    2026

  • LEVELS

    5 + LOFT

  • STATUS

    IN PROGRESS

This project aims to reconstruct an existing building by implementing major structural framework reinforcements. Construction works will begin shortly and will be completed 15-16 months from the beginning of the construction works . It's only five minutes' walk from Vas. Olgas Avenue in the city center, ten minutes' walk from the Metro station and a short stroll from the waterfront.

Being one of the eastern suburbs nearest to the city center, this region is foreseen to grow even more with the start of the Metro service.

The structure will include 41 flats spread across 5 stories with a loft. Every apartment starting on the third floor will have parking. The structure will include 41 flats spread across 5 stories with a loft. All units starting on the third floor will feature parking spots in the basement and on the ground level open area.

In the building only the load-bearing structure with the infill walls has been completed.

A study of the structural adequacy and reinforcement of the load-bearing structure has been carried out and will form an integral part of the building permit to be issued.

In accordance with this, samples have been taken for laboratory testing of the quality of concrete and steel for the building in question, and reinforcement tests have been carried out on elements of columns, beams and walls. The building has been assessed for its load-bearing capacity to meet the B1 performance level in accordance with the Intervention Code, as amended and in force (i.e. it is designed with the seismic performance of modern building codes).

Consequently, its load-bearing structure will be structurally adequate in accordance with the modern regulations applicable to the design of new buildings (performance level B1 according to ΚΑΝΕΠΕ Β1) and will therefore meet all the latest specifications to safely carry the loads for which it has been designed.

As regards the energy coverage of the building (energy class A), it is planned to use appropriate thermal insulation materials for the building, and in addition, special energy-efficient frames will be used, based on the KENAK study.

The heating of the interior spaces will be provided by an individual gas boiler.


A striking, contemporary architectural design that will be unique in its environment.

Download PDF
PATRON 9
15/06/2026
FLOΟRA/ANET SQM% ON THE PLOTGROSS SQMSTORAGE ROOMSQM PARKINGLEVELSQMPRICE/STATUS
MEZZANINEΗ140,702,0947,22***  SOLD
1STΑ141,832,1648,54***  SOLD
1STΑ234,081,7639,55***  SOLD
1STΑ350,422,6158,5216,05*  SOLD
1STΑ440,282,0846,75**P9GRF10,56SOLD
1STΑ552,012,6960,35**P15BSM10,56SOLD
1STΑ639,32,0345,60***  120.000,00  € 
1STΑ747,872,4855,55***  SOLD
1STΑ846,392,4053,82***  SOLD
1STΑ950,42,6158,47*****155.000,00 € Under legal control
2NDΒ141,822,1648,53***  SOLD
2NDΒ234,091,7639,56***  SOLD
2NDΒ350,452,6158,55**P10GRF10,56SOLD
2NDΒ440,32,0846,77***  SOLD
2NDΒ552,042,6960,38**P4GRF10,56SOLD
2NDΒ639,312,0345,61***  SOLD
2NDΒ747,852,4755,53**P12BSM10,56SOLD
2NDΒ846,372,4053,80**P12GRF10,56SOLD
2NDΒ950,362,6058,43**P11GRF10,56SOLD
3RDΓ150,552,6158,65**P7BSM10,56SOLD
3RDΓ238,461,9944,62**P8GRF10,56SOLD
3RDΓ335,021,8140,63**P9BSM10,56SOLD
3RDΓ439,652,0546,00**P5GRF10,56SOLD
3RDΓ533,41,7338,76**P11BSM10,56SOLD
3RDΓ647,562,4655,19**P10BSM10,56SOLD
3RDΓ746,382,4053,81**P13BSM10,56SOLD
3RDΓ850,42,6158,47**P14BSM10,56SOLD
4THΔ150,522,6158,62**P1GRF10,56SOLD
4THΔ251,742,6860,03**P2GRF10,56SOLD
4THΔ347,32,4554,87**P3GRF10,56SOLD
4THΔ446,22,3953,60**P6BSM10,56SOLD
4THΔ546,382,4053,81**P8BSM10,56SOLD
4THΔ647,12,4454,64**P6GRF10,56SOLD
5THΕ137,821,9643,87**P1BSM10,56SOLD
5THΕ237,081,9243,02**P2BSM10,56SOLD
5THΕ336,381,8842,21**P3BSM10,56SOLD
5THΕ432,861,7038,14**P4BSM10,56SOLD
5THΕ528,141,4532,64**P5BSM10,56SOLD
5THΕ651,242,6559,45**P7+P13
GRF10,56+17,48SOLD
ATTICΣΤ123,5612,1027,3526,08***SOLD